• The Quadrant, Network Rail HQ

  • PROJECT DETAILS

    SystemINTRAflex XT
    SpecificationRubber fibre combination with fibre insert beyond
    LocationMilton Keynes
    ArchitectGMW

    Safe and clean

    At the heart of Britain’s railway operations is The Quadrant in Milton Keynes – a striking complex that unites over 3,000 people under one roof, all working to keep Britain moving, with over 1.6 billion journeys made by rail each year. The building spans over 400,000 square feet and houses virtually everything from a gym to convenience stores! Keeping soil and moisture out of this building is the INTRAflex XT Heavy Duty Entrance Matting, which was installed to both main entrances.

    INTRAflex XT

    At the forefront of entrance matting design and innovation, this product has been used extensively …